Nicholas Gary Stocks · Prevention of Future Deaths report

Pin Get email alerts Request correction

Issued 27 May 2015•West Yorkshire (West)

Report record

Published report and response evidence

This page connects the concerns raised in this report with statements found in recipients’ published responses. A link shows a clear evidence connection; it does not assign responsibility.

View original report
Concerns
12

Raised in this report

Recipients
2

Named on the report

Responses found
1

Of 2 recipients

Stated actions
7

Described in responses

Source document

Full report text

This is the full text from the original published report.

Open published report

Concerns and recipient responses

Select any concern, action or position to view the source wording.

Report evidence summary

Concerns raised12

  1. 50 mph speed limit at the incident junction approaches
    Part of recurring concern: Inadequate safety controls at high-risk road junctionsPart of recurring concern: Inadequate speed control at hazardous road locations
  2. Inconsistent highway inspection practices
    Part of recurring concern: Unreliable highway inspection and asset-recording processes
  3. Failure to undertake risk assessments and determine urgency of remedial work after road traffic collisions
    Part of recurring concern: Unreliable highway safety risk assessment and remedial-work prioritisation
Responses linked to these concerns

Each statement is shown once, even when linked to more than one concern.

Actions described in response An action is something a recipient says it has done, is doing, or plans to do in response to a concern raised.7

  1. Action

    Require communications staff to telephone local authorities about urgent safety defects and record the contact, information supplied and estimated attendance on the police log.

    Stated by Temporary Chief Constable CollinsStated plannedThe respondent said that this action was planned when they made their response on 27 May 2015.
  2. Action

    Agree shared responsibility with Kirklees Council for collision-scene risk assessment and urgency decisions, transferring responsibility after council staff assess the defect.

    Stated by Temporary Chief Constable CollinsStated completedThe respondent said that this action was complete when they made their response on 27 May 2015.
  3. Action

    Update Force Communications systems with Kirklees Council contact numbers enabling direct 24/7 communication and urgent attendance arrangements.

    Stated by Temporary Chief Constable CollinsStated completedThe respondent said that this action was complete when they made their response on 27 May 2015.

Respondent positions A position is what a recipient says about a concern when it does not describe a specific action.1

  1. Position

    After council staff attend, Kirklees Council assumes responsibility for assessing and determining action on the road defect.

    Stated by Temporary Chief Constable CollinsRedirects responsibilityThe respondent said that another organisation was responsible for deciding or taking action.

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

50 mph speed limit at the incident junction approaches

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate safety controls at high-risk road junctions; Inadequate speed control at hazardous road locations.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Inconsistent highway inspection practices

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Unreliable highway inspection and asset-recording processes.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to undertake risk assessments and determine urgency of remedial work after road traffic collisions

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Unreliable highway safety risk assessment and remedial-work prioritisation.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to follow up remedial work assigned to other agencies

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Failure to ensure identified safety remedial works are completed.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Potentially inadequate street lighting at road junction approaches

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate and unreliable public-road street lighting; Inadequate outdoor safety lighting.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to identify and report defective road markings for repair

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate road markings for road-user safety.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Lack of ongoing training and assessment of Safety Inspectors

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate formal health and safety training for responsible staff.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Absence of visible signs or road markings at an approaching Give Way junction

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate road markings for road-user safety; Inadequate safety controls at high-risk road junctions.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to appropriately assess and act on public reports of highway defects

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Failure of the highway hazard reporting and response process.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Unclear allocation of responsibility for inspecting road junctions

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Unreliable highway inspection and asset-recording processes.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Failure to fully report matters of concern identified at road traffic collision scenes

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Inadequate road-traffic-collision reporting for highway safety management.

Open source report

Source evidence

How this individual concern was interpreted

PFD Monitor created a concise, searchable interpretation from the report wording shown below. Response links show a clear evidence connection; they do not assign responsibility.

PFD Monitor interpretation

Unavailability of an appropriately manned emergency reporting route

Wider context from the report

“West Yorkshire Police (1) I am concerned with the system that was in place to ensure that matters of concern identified by Officers of West Yorkshire Police who attend the scene of Road Traffic Collision in November 2011 were not fully reported to Kirklees Council. I would ask you to review the system presently in place to ensure that all future reports are made and fully reported (2) On the afternoon of the 27th September 2012 following the earlier road traffic incident, a Police Officer identified the need for a repair to the Give Way sign which had been demolished. The Police Officer in attendance would have been able to also identify that the road markings at the scene were no longer visible and therefore any road user who was travelling along Dry Hill Lane would have had no visible signs or road markings on the approaching Give Way junction. In essence the Officer would have been able to undertake a risk assessment and identify the level of urgency for remedial repair works to be undertaken. I would invite West Yorkshire Police to liaise with the relevant department of Kirklees Council and undertake a new review and consider whose responsibility it should be to undertake a risk assessment at the scene of a road traffic collision in order to determine the level of urgency of remedial work which is required to be carried out so as to ensure the safety of road users and to develop a system so as to ensure that risk assessment process is implemented and carried out. (3) I would also ask you to liaise with the relevant departments of Kirklees Council in order to carry out investigations to determine which departments of Kirklees Council was contacted on the afternoon on 27th September 2012 to report the damage to the give way sign. I heard evidence that Kirklees Council Customer Services, the relevant department which should have been contacted, and who are contactable between the hours of 8.00 and 18 hours. Outside of these hours an answer machine message provides an emergency contact number. If the control room unit had contacted the customer service centre then this telephone line should have been manned and a response received rather than sending an email which was acknowledged by an automated response. I wish to ensure that firstly West Yorkshire Police have the relevant contact number which needs to be used in the future and secondly if the Customer Service centre at Kirklees Council was contacted it clearly was not manned at the appropriate time, I wish to ensure this is rectified. Kirklees Council (1) I have concerns with the regard to the wide variation of how road inspections are undertaken by your Safety Inspectors. During the course of the enquiries undertaken by West Yorkshire Police a number of interviews were conducted with a number of safety inspectors. I have reviewed those interviews and note that there was a wide variation on how Safety Inspectors undertook inspections of a highway.. One Inspector indicated that they would inspect one side of the road one month, and when inspecting the road the following month would inspect the other side of the carriageway. Another Inspector indicated that they would inspect the whole of the carriageway on each inspection. Another Safety Inspector stated that the driver also had a role to place in inspecting the road in addition to driving the vehicle which transported the Safety Inspector who would be seated in the front passenger seat. (2) I have concerns with regard to how Safety Inspectors identify issues at the junction of two roads and which inspection has responsibility to consider matters at the actual junction. There appeared to have been vague and unclear responses from the Inspectors who gave evidence, as to whose responsibility it would be to actually inspect the junction of the two roads. (3) I was concerned that neither of the two Safety Inspectors who gave evidence, considered that the lack of road markings at the junction of Barnsley Road and Dry Hill Lane, and upon Dry Hill Lane itself posed a safety risk to road users and applying appropriate risk assessment should have been repaired I heard evidence from a highly qualified independent expert who was fully familiar with the Kirklees inspection policy and who stated that the lack of road markings at the junction with Barnsley Road and upon Dry Hill Lane itself, were identifiable and reportable defects applying Kirklees Council Policy criteria and should have been reported by the Safety Inspectors and repaired. In addition the independent expert stated that the poor state of the road markings would have been present for a considerable and significant period of time. Certainly, when each of the roads had last been inspected by a Safety Inspector from Kirklees Council. (4) I also have concern that there is no ongoing training and assessment of Safety Inspectors after initial training has been given so as to ensure consistency and appropriate standard levels of inspections are maintained. I would invite Kirklees Council to undertake a comprehensive review of the training of all of their Safety Inspectors and consider what further retraining requirements are required now and in the future. (5) I would refer you to the comments I have made in the West Yorkshire Police section of this report in respect of the operation of Kirklees Council’s Customer Service Centre. I would ask you to liaise directly with West Yorkshire Police and review and ensure the Customer Centre Service facility is fully operational at all relevant times (6) I would also ask you to liaise with West Yorkshire Police in respect of the comments made in the West Yorkshire Police Section of this report concerning risk assessments when a road traffic collision occurs and West Yorkshire Police in attendance and identify the need for repair works to be undertaken, so as to ensure that an immediate risk assessment is undertaken to safeguard members of the public. (7). From details provided in the course of this investigation, it appears that remedial work was required to be undertaken by Yorkshire Water at the junction with Barnsley Road and Dry Hill Lane. This work was to identified on 13th March 2010 and the 5th March 2012, but there was no record that such work had been undertaken, and no follow up was implemented by Kirklees Council, so as to ensure that this work was carried out. I would invite you to review your systems so as to ensure that work is undertaken by other agencies and checks made to ensure that all necessary works are completed. (8) Evidence at the inquest also revealed that members of the public had reported the lack of road markings to Kirklees Council, some months prior to this incident occurring. Although Kirklees Council records show no further action required. I am concerned with regard to this finding in light of the evidence provided to me by the independent expert who confirmed that the lack of road markings was clearly a defect which fell within the Councils existing guidance as an identifiable defect which required rectification. I would invite you to review the present system that Kirklees Council has in place with addressing complaints made by members of the public in respect of the roads and highways which fall within your designated area. 9. I understand that major road works have been undertaken by Kirklees Council at the scene of this incident. However, at the inquest it was clear that the speed limit still remains to be 50 mph. I would invite you to review the speed limit not only on Dry Hill Lane, but also Barnsley Road and Lower Denby Lane. I would request you to review the street lighting along Lower Denby Lane and Dry Hill Lane at their approach to the junction with Barnsley Road and whether any additional lighting is required. ”

Is this part of a recurring concern?

Yes — Unreliable access to emergency communication.

Open source report

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Require communications staff to telephone local authorities about urgent safety defects and record the contact, information supplied and estimated attendance on the police log.

Verbatim wording from the response

“In addition, where there is an obvious safety risk and the repairs/remedial action is required urgently, contact will be made by communications staff via telephone to the local authority for the area. The operator will endorse on the police log the name of the person they spoke to, the details supplied and the estimated time of arrival indicated by the authority.”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Agree shared responsibility with Kirklees Council for collision-scene risk assessment and urgency decisions, transferring responsibility after council staff assess the defect.

Verbatim wording from the response

“I have liaised with Kirklees Council and have agreed that responsibility for this risk assessment is shared as follows: For incidents that the Police attend it will be for the attending officer to carry out the risk assessment and decide the urgency of any remedial action required. If the officer decides that the defect is so dangerous as to require immediate action then they should communicate this to the council via their control room and remain with the defect until the council attend. Once the council staff do attend the officer should explain their concerns. It will”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Update Force Communications systems with Kirklees Council contact numbers enabling direct 24/7 communication and urgent attendance arrangements.

Verbatim wording from the response

“My representative has met with Kirklees Council and can confirm that I now have up to date contact telephone numbers enabling my communications staff to speak to someone directly “24/7”. This has been updated on our Force Communications systems. It has been agreed that if the matter is urgent the authority will attend the scene within an hour. For non urgent cases the matter will be reported via the email system as detailed above.”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Require officers to risk-assess collision scenes, remain until safety is addressed, and prevent log closure until safety and defect-reporting questions are answered.

Verbatim wording from the response

“All officers will be reminded of the need to conduct a thorough risk assessment of the location prior to leaving the scene and will not resume until either; i) it is deemed safe to do so, or, ii) the local authority has attended, or, iii) the local authority have assessed the risk against their protocols or, iv) remedial works have been implemented to remove any risk to the safety of other road users. This will be endorsed on the log by the communications staff. The log will not be closed unless the following questions are answered”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Circulate force-wide guidance reminding staff to submit timely defect reports after collisions and record the requirement in Force collision policy.

Verbatim wording from the response

“I will ensure that a Force wide communication is circulated to ensure that staff are reminded of the importance of submitting this information in a timely manner and that it is mandatory after the attendance at a road traffic collision where defects are identified. This will also be entered into Force Policy on dealing with collisions.”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Review and update reporting processes, including authority contact details and a monitored generic mailbox for defect reports.

Verbatim wording from the response

“I have taken this opportunity to review our reporting processes in regard to reports made to all five local authorities within our area. This review will involve ensuring that the postal/email addresses automated by our current systems are up to date and that there is the facility to send reports to a generic mailbox which is monitored by several people rather than an individual thereby ensuring the reports are received and dealt with in a timely manner.”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 1 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent action was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

Preload local-authority contact telephone numbers into the Force Communications system for accessible 24/7 reporting.

Verbatim wording from the response

“I am currently in liaison with the five local authorities to ensure that the contact details we hold, both email and telephone, will direct the information/report to the correct department to enable an appropriate response. Furthermore, I will ensure that contact telephone numbers for the”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 1 · response
Published 27 May 2015

Open published response

Source evidence

How this respondent position was interpreted

PFD Monitor created a concise, searchable interpretation from the published response wording shown below.

PFD Monitor interpretation

After council staff attend, Kirklees Council assumes responsibility for assessing and determining action on the road defect.

Verbatim wording from the response

“I have liaised with Kirklees Council and have agreed that responsibility for this risk assessment is shared as follows: For incidents that the Police attend it will be for the attending officer to carry out the risk assessment and decide the urgency of any remedial action required. If the officer decides that the defect is so dangerous as to require immediate action then they should communicate this to the council via their control room and remain with the defect until the council attend. Once the council staff do attend the officer should explain their concerns. It will”

Source location

2015-0200-Response-by-West-Yorkshire-Police
Page 2 · response
Published 27 May 2015

Open published response
Back to top

Information checked against the published report and official responses · Data reviewed 7 Sep 2026 · About data quality and limitations

Official responses located
1/2